docs: reconcile project status and local stack operations
Refresh entry points and progress checkpoints, document schema revision 0006, and consolidate the final ElevenLabs/GapGPT profile and host prerequisites. Preserve dated activation evidence and distinguish implementation, targeted validation, incomplete full-suite checks and remaining human acceptance gates. Validation: 409 local Markdown link targets resolved and staged whitespace checks passed.
This commit is contained in:
+40
-40
@@ -1,51 +1,51 @@
|
||||
# Project documentation
|
||||
|
||||
The current implementation baseline is the English revision 1.3
|
||||
[Live document MVP delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md).
|
||||
It targets a conditional four-day demo using the existing ingestion/embedding
|
||||
Phases 1-4, LangChain RAG/tools, new browser uploads and direct Gemini Live.
|
||||
The four supplied examples are mandatory initial tests, not an upload allowlist.
|
||||
Full text chat/history and settings editing are deferred.
|
||||
Start with [current status](current-status.md) for implemented capabilities,
|
||||
the last recorded local profile, evidence boundaries and remaining gates.
|
||||
Use the [reference map](agent-reference-map.md) for source locations and dated
|
||||
authorized amendments. Historical reports describe the run/date named in them;
|
||||
their pending or running statements do not describe today's service state.
|
||||
|
||||
## Implementation reading order
|
||||
## Contract authority
|
||||
|
||||
1. [Delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md): active scope, gates, Days 1-4 and MVP-01 through MVP-14.
|
||||
2. [Implementation guide](specifications/RAG-Phase1-Implementation-Guide.md): work packages, embedding/LangChain boundary, worker and retained review/resume.
|
||||
3. [API catalog](specifications/RAG-Phase1-API-Catalog.md): active/deferred routes, D06/D07 exact review and authenticated Live.
|
||||
4. [Database design](specifications/RAG-Phase1-Database-Design.md): existing foundation, proposed forward review/identity/voice changes and invariants.
|
||||
5. [English scenarios](specifications/RAG-Phase1-MVP-Scenarios.md): supplied and unseen uploads, factual FAQ, voice and failure walkthroughs.
|
||||
6. [Architecture](specifications/RAG-AI-Architecture.md): dependency boundaries; broader deferred sections are context.
|
||||
1. [Phase 1 delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md): scope.
|
||||
2. [API catalog](specifications/RAG-Phase1-API-Catalog.md): public contracts and amendments.
|
||||
3. [Database design](specifications/RAG-Phase1-Database-Design.md): persistence contracts.
|
||||
4. [Implementation guide](specifications/RAG-Phase1-Implementation-Guide.md): workflows.
|
||||
5. [English scenarios](specifications/RAG-Phase1-MVP-Scenarios.md): acceptance scenarios.
|
||||
6. [Architecture](specifications/RAG-AI-Architecture.md): broader context and boundaries.
|
||||
|
||||
The plan governs scope, API/database govern contracts and the guide governs
|
||||
workflows. Proposed mechanisms are not implementation-completion reports.
|
||||
The English revision 1.3 baseline is amended by the dated authorized changes in
|
||||
the reference map. Existing code alone does not override a contract. Full text
|
||||
chat/history and arbitrary settings/model editing remain deferred. The Persian
|
||||
revision 1.2 scenario report is historical.
|
||||
|
||||
Implementation progress is tracked in the [Live document MVP TODO](plans/live-document-mvp-todo.md). Checked baseline components do not prove complete MVP acceptance.
|
||||
## Operations and validation
|
||||
|
||||
## Current code and recorded evidence
|
||||
- [Backend startup/recovery](guides/phase4-backend-operations.md).
|
||||
- [Current local Windows stack](guides/current-local-stack.md): final recorded
|
||||
routing, profile settings, startup dependencies, HTTPS and verification.
|
||||
- [Foundation setup](guides/ingestion-foundation-setup.md) and
|
||||
[worker orchestration](guides/worker-orchestration.md).
|
||||
- [Tests](../tests/README.md): provider-free checks and isolated PostgreSQL acceptance.
|
||||
- [Local S2S engine](../services/local_s2s/README.md): build/native-engine details.
|
||||
- [Progress checklist](plans/live-document-mvp-todo.md) and
|
||||
[Local S2S progress](plans/local-s2s-adapter-progress.md).
|
||||
|
||||
- [Reference map](agent-reference-map.md): source inventory, agent routes and historical acceptance.
|
||||
- [Ingestion pipeline plan](plans/ingestion-pipeline-plan.md): implemented ingestion Phases 1-6 backend/validation and pending HTTP/search/Live integration.
|
||||
- [Setup and validation](guides/ingestion-foundation-setup.md): actual commands and recorded checks; real provider/voice quality remains separate.
|
||||
- [Repository instructions](../AGENTS.md) and [test guidance](../tests/README.md).
|
||||
## Latest change reports
|
||||
|
||||
Phase 5 worker/publication/retry and retained review/resume backend services are
|
||||
implemented; [Phase 6 operator handoff](guides/ingestion-operator-handoff.md)
|
||||
records integration acceptance and the separate opt-in provider smoke command.
|
||||
Scoped pgvector search/selection and Fast-Track Search Phase 2 technical
|
||||
correctness are implemented; [Phase 2 results and calibration prerequisites](guides/scoped-search-phase2.md)
|
||||
record actual acceptance. Real-model cutoff calibration, LangChain, authenticated
|
||||
D06/D07 transport, HTTP identity/upload, browser integration, Live and UI remain pending. Real-provider
|
||||
compatibility and Persian extraction/semantic quality are not certified by mocks.
|
||||
The [root README](../README.md) retains prototype startup instructions.
|
||||
- [Deletion, public models and diagnostics](guides/server-source-sync-20261018.md).
|
||||
- [GapGPT and subsequent ElevenLabs activation](guides/local-gapgpt-20261018.md).
|
||||
- [Strict current-turn grounding and ten-source retrieval](guides/strict-grounding-20261018.md).
|
||||
- [LAN HTTPS and client trust](guides/local-lan-access-20261018.md).
|
||||
- [Combined ingestion/RAG/voice evidence](evaluation/local-s2s/combined-ready-20261017.md).
|
||||
- [Presentation diagrams](presentation/README.md).
|
||||
|
||||
## Historical context and corpus boundary
|
||||
The modular backend implements identity/upload/review transport, scoped search
|
||||
and authenticated voice; older ingestion reports that call these pending are
|
||||
historical checkpoints. Frontend source lives in the sibling repository and
|
||||
cannot be committed from this repository.
|
||||
|
||||
The [Persian scenario report](specifications/RAG-Phase1-Scenario-Report-FA.md)
|
||||
is preserved as historical revision 1.2. New MVP instructions/scenarios are English.
|
||||
Older text/history/settings promises do not override revision 1.3.
|
||||
|
||||
Project documentation stays under docs; uploaded/sample corpus stays under data.
|
||||
Documentation changes do not clean/rebuild any existing vector index.
|
||||
Preserve applied migrations, independent immutable document IDs, technical
|
||||
revisions and compatible embedding profiles. Do not index project specifications
|
||||
as organization knowledge.
|
||||
Documentation stays under docs; uploaded/sample corpus stays under data.
|
||||
Preserve applied migrations, immutable document identities, technical revisions
|
||||
and compatible embedding profiles. Do not rebuild an index as documentation cleanup.
|
||||
|
||||
Reference in New Issue
Block a user