feat(voice): add bounded Realtime knowledge runtime
Connect OpenAI Realtime to the existing async StructuredTool and shared SearchToolRunner with backend-owned authority and per-turn source references. Add an operator-only smoke harness with persisted actor and provider opt-in. Enforce confirmed readiness delivery, strict function identity, canonical results and once-only continuations. Bound and pace generated audio, preserve turn correlation, and require acknowledged cleanup before response release. Handle Unicode arguments, UTF-8 replay budgets and user-ASR completion replays. Validate with 318 voice/runner/shutdown tests and 1563 provider-free tests. Three Windows symlink tests skip; 311 PostgreSQL tests are deselected. Real-provider, browser playback and PostgreSQL acceptance remain unrun.
This commit is contained in:
@@ -405,3 +405,62 @@ For each material failure, record the scenario, expected behavior, correlated ID
|
||||
- **Real-call limits:** retain the existing ten-call calibration and 26-query evaluation bounds. Use a separately opted-in voice smoke run capped at ten minutes total. Ingestion has its own explicit budget.
|
||||
- **External prerequisites:** approved originals/document bindings, required human review, compatible database/provider access, and frontend availability. Missing prerequisites block their dependent acceptance only.
|
||||
- **Markdown artifact:** this plan is stored as `docs/plans/realtime-agent-mvp-plan.md`. Add links to phase completion reports as implementation progresses. This document records the proposed work; it does not claim implementation or runtime acceptance.
|
||||
|
||||
## Phase 1 repair checkpoint (2026-10-08)
|
||||
|
||||
Implemented the scoped existing-runtime repairs; see
|
||||
[operator configuration, behavior, exact checks and remaining acceptance](../guides/realtime-agent-phase1.md#phase-1-repair-acceptance).
|
||||
The original proof/mock scripts, shared canonical search/StructuredTool/runner,
|
||||
migrations and frozen inputs remain unchanged.
|
||||
|
||||
Targeted fake-provider/shared-runner/shutdown acceptance: 181 passed.
|
||||
Final provider-free acceptance: 1426 passed, three existing Windows symlink
|
||||
skips and 311 PostgreSQL tests deselected. Dependency, AST, manifest, whitespace,
|
||||
guide-link and baseline preservation checks passed. Real provider/Persian
|
||||
speech/browser playback and isolated PostgreSQL acceptance remain unrun; missing
|
||||
opt-in/calibrated corpus bindings and TEST_DATABASE_URL are not filled with
|
||||
invented evidence. The cancellation classifier remains fail-closed. This
|
||||
checkpoint does not claim the real grounded-provider Phase 1 exit criterion.
|
||||
|
||||
## Five remaining Phase 1 defects checkpoint (2026-10-08)
|
||||
|
||||
Repaired independent failure cleanup, one-to-one function identity, exact adapter
|
||||
wire accounting, common call-ID validation and successful empty-audio lifecycle.
|
||||
See [behavior, regression evidence and exact executed checks](../guides/realtime-agent-phase1.md#five-remaining-defects-repair-2026-10-08).
|
||||
This later checkpoint passed 229 targeted tests and 1474 provider-free tests
|
||||
(three existing Windows symlink skips; 311 PostgreSQL tests deselected).
|
||||
Protected inputs and unrelated changes remain preserved; shared retrieval and
|
||||
the existing 50 ms runner test are unchanged. Real provider, speech, browser
|
||||
playback and isolated PostgreSQL acceptance remain unrun with the prerequisites
|
||||
and fail-closed limits recorded in the operator guide. Scope remains Phase 1.
|
||||
|
||||
## Readiness and Unicode Phase 1 checkpoint (2026-10-08)
|
||||
|
||||
Repaired application admission to require successful session_ready delivery,
|
||||
separate from provider-confirmed setup. Malformed Unicode model arguments now
|
||||
receive canonical INVALID_TOOL_ARGUMENTS with safe bounded replay fingerprints,
|
||||
while provider framing/correlation remains strict.
|
||||
See [operator behavior, evidence and exact checks](../guides/realtime-agent-phase1.md#readiness-and-unicode-repair-2026-10-08).
|
||||
|
||||
This later checkpoint adds 52 regressions: 281 targeted tests passed; the full
|
||||
provider-free suite passed 1526 tests with three existing Windows symlink skips
|
||||
and 311 PostgreSQL tests deselected. Protected files and unrelated changes were
|
||||
preserved. Real provider/speech/browser and isolated PostgreSQL acceptance remain
|
||||
unrun; missing calibration and unproved cancellation classification remain
|
||||
fail-closed. Historical results above are unchanged. Scope remains Phase 1.
|
||||
|
||||
## Provider replay and user ASR Phase 1 checkpoint (2026-10-08)
|
||||
|
||||
Repaired replay hashing to retain the provider's actual UTF-8 wire admission
|
||||
without applying that cap to ASCII expansion or canonical numeric spelling.
|
||||
Completed user-ASR is coalesced by mapped input/content identity, with conflicts
|
||||
failing observably and legitimate repeated partial text preserved.
|
||||
See [operator evidence, failures/reruns and exact checks](../guides/realtime-agent-phase1.md#provider-replay-and-user-asr-repair-2026-10-08).
|
||||
|
||||
This checkpoint adds 37 cases: 318 targeted tests passed; 1563 provider-free tests
|
||||
passed with three existing Windows symlink skips and 311 PostgreSQL tests
|
||||
deselected. Protected files, unrelated changes, shared search/runner and the
|
||||
existing 50 ms test remain preserved. Historical results above remain distinct.
|
||||
Real provider/speech/browser and isolated PostgreSQL acceptance remain unrun,
|
||||
subject to authorization/calibrated actor/corpus prerequisites and fail-closed
|
||||
calibration/cancellation classification. Scope remains Phase 1.
|
||||
|
||||
Reference in New Issue
Block a user