docs: restructure documentation hierarchy and update agent reference map

- Organize architecture, specifications, plans, and guides into dedicated subdirectories under docs/
- Remove legacy and duplicate documents from data/documents/
- Update AGENTS.md, README.md, and agent skills to target canonical docs paths
This commit is contained in:
amirhosein mazaheri
2026-10-07 16:19:24 +03:30
parent baf58da562
commit ca8833dd2f
30 changed files with 6121 additions and 2768 deletions
+49
View File
@@ -0,0 +1,49 @@
# Project documentation
The current implementation baseline is the English revision 1.3
[Live document MVP delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md).
It targets a conditional four-day demo using the existing ingestion/embedding
Phases 1-4, LangChain RAG/tools, new browser uploads and direct Gemini Live.
The four supplied examples are mandatory initial tests, not an upload allowlist.
Full text chat/history and settings editing are deferred.
## Implementation reading order
1. [Delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md): active scope, gates, Days 1-4 and MVP-01 through MVP-14.
2. [Implementation guide](specifications/RAG-Phase1-Implementation-Guide.md): work packages, embedding/LangChain boundary, worker and retained review/resume.
3. [API catalog](specifications/RAG-Phase1-API-Catalog.md): active/deferred routes, D06/D07 exact review and authenticated Live.
4. [Database design](specifications/RAG-Phase1-Database-Design.md): existing foundation, proposed forward review/identity/voice changes and invariants.
5. [English scenarios](specifications/RAG-Phase1-MVP-Scenarios.md): supplied and unseen uploads, factual FAQ, voice and failure walkthroughs.
6. [Architecture](specifications/RAG-AI-Architecture.md): dependency boundaries; broader deferred sections are context.
The plan governs scope, API/database govern contracts and the guide governs
workflows. Proposed mechanisms are not implementation-completion reports.
Implementation progress is tracked in the [Live document MVP TODO](plans/live-document-mvp-todo.md). Checked baseline components do not prove complete MVP acceptance.
## Current code and recorded evidence
- [Reference map](agent-reference-map.md): source inventory, agent routes and historical acceptance.
- [Ingestion pipeline plan](plans/ingestion-pipeline-plan.md): implemented ingestion Phases 1-6 backend/validation and pending HTTP/search/Live integration.
- [Setup and validation](guides/ingestion-foundation-setup.md): actual commands and recorded checks; real provider/voice quality remains separate.
- [Repository instructions](../AGENTS.md) and [test guidance](../tests/README.md).
Phase 5 worker/publication/retry and retained review/resume backend services are
implemented; [Phase 6 operator handoff](guides/ingestion-operator-handoff.md)
records integration acceptance and the separate opt-in provider smoke command.
Authenticated D06/D07 transport, scoped pgvector search/selection, HTTP
identity/upload, browser integration, Live and UI remain pending. Real-provider
compatibility and Persian extraction/semantic quality are not certified by mocks.
The [root README](../README.md) retains prototype startup instructions.
## Historical context and corpus boundary
The [Persian scenario report](specifications/RAG-Phase1-Scenario-Report-FA.md)
is preserved as historical revision 1.2. New MVP instructions/scenarios are English.
Older text/history/settings promises do not override revision 1.3.
Project documentation stays under docs; uploaded/sample corpus stays under data.
Documentation changes do not clean/rebuild any existing vector index.
Preserve applied migrations, independent immutable document IDs, technical
revisions and compatible embedding profiles. Do not index project specifications
as organization knowledge.