Local S2S phase prompts
Read the complete plan and progress ledger. Each file contains one copy-ready English prompt. Run one phase at a time; never assume prerequisites passed.
- Phase 0 - Baseline and immutable upstream audit
- Phase 1 - Small provider boundary with OpenAI preserved
- Phase 2 - Isolated S2S engine with OpenRouter stages
- Phase 3 - Local provider and normal browser session
- Phase 4 - Verified interruption and history synchronization
- Phase 5 - Shared RAG and declared-source integration
- Phase 6 - Persian quality, latency, cost and resilience
- Phase 7 - Controlled switch and verified rollback