Add exact and semantic evidence admission, measured calibration, bounded tool execution, and independent held-out evaluation preparation with regression coverage and operator guides. Real-provider quality gates remain pending. Validation: 1300 provider-free tests passed; 3 Windows symlink skips. PostgreSQL acceptance not rerun because TEST_DATABASE_URL is unset.
52 lines
3.5 KiB
Markdown
52 lines
3.5 KiB
Markdown
# Project documentation
|
|
|
|
The current implementation baseline is the English revision 1.3
|
|
[Live document MVP delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md).
|
|
It targets a conditional four-day demo using the existing ingestion/embedding
|
|
Phases 1-4, LangChain RAG/tools, new browser uploads and direct Gemini Live.
|
|
The four supplied examples are mandatory initial tests, not an upload allowlist.
|
|
Full text chat/history and settings editing are deferred.
|
|
|
|
## Implementation reading order
|
|
|
|
1. [Delivery plan](specifications/RAG-AI-Phase1-Delivery-Plan.md): active scope, gates, Days 1-4 and MVP-01 through MVP-14.
|
|
2. [Implementation guide](specifications/RAG-Phase1-Implementation-Guide.md): work packages, embedding/LangChain boundary, worker and retained review/resume.
|
|
3. [API catalog](specifications/RAG-Phase1-API-Catalog.md): active/deferred routes, D06/D07 exact review and authenticated Live.
|
|
4. [Database design](specifications/RAG-Phase1-Database-Design.md): existing foundation, proposed forward review/identity/voice changes and invariants.
|
|
5. [English scenarios](specifications/RAG-Phase1-MVP-Scenarios.md): supplied and unseen uploads, factual FAQ, voice and failure walkthroughs.
|
|
6. [Architecture](specifications/RAG-AI-Architecture.md): dependency boundaries; broader deferred sections are context.
|
|
|
|
The plan governs scope, API/database govern contracts and the guide governs
|
|
workflows. Proposed mechanisms are not implementation-completion reports.
|
|
|
|
Implementation progress is tracked in the [Live document MVP TODO](plans/live-document-mvp-todo.md). Checked baseline components do not prove complete MVP acceptance.
|
|
|
|
## Current code and recorded evidence
|
|
|
|
- [Reference map](agent-reference-map.md): source inventory, agent routes and historical acceptance.
|
|
- [Ingestion pipeline plan](plans/ingestion-pipeline-plan.md): implemented ingestion Phases 1-6 backend/validation and pending HTTP/search/Live integration.
|
|
- [Setup and validation](guides/ingestion-foundation-setup.md): actual commands and recorded checks; real provider/voice quality remains separate.
|
|
- [Repository instructions](../AGENTS.md) and [test guidance](../tests/README.md).
|
|
|
|
Phase 5 worker/publication/retry and retained review/resume backend services are
|
|
implemented; [Phase 6 operator handoff](guides/ingestion-operator-handoff.md)
|
|
records integration acceptance and the separate opt-in provider smoke command.
|
|
Scoped pgvector search/selection and Fast-Track Search Phase 2 technical
|
|
correctness are implemented; [Phase 2 results and calibration prerequisites](guides/scoped-search-phase2.md)
|
|
record actual acceptance. Real-model cutoff calibration, LangChain, authenticated
|
|
D06/D07 transport, HTTP identity/upload, browser integration, Live and UI remain pending. Real-provider
|
|
compatibility and Persian extraction/semantic quality are not certified by mocks.
|
|
The [root README](../README.md) retains prototype startup instructions.
|
|
|
|
## Historical context and corpus boundary
|
|
|
|
The [Persian scenario report](specifications/RAG-Phase1-Scenario-Report-FA.md)
|
|
is preserved as historical revision 1.2. New MVP instructions/scenarios are English.
|
|
Older text/history/settings promises do not override revision 1.3.
|
|
|
|
Project documentation stays under docs; uploaded/sample corpus stays under data.
|
|
Documentation changes do not clean/rebuild any existing vector index.
|
|
Preserve applied migrations, independent immutable document IDs, technical
|
|
revisions and compatible embedding profiles. Do not index project specifications
|
|
as organization knowledge.
|